Documents
Our goal is to be a transparent partner in this process. This website will host all available data, documents, details and timelines.
Title | Description | Category | Download |
---|---|---|---|
Critical Design Aircraft Display Board | 09-22 Public Meeting | Download | |
Draft Chapter 1 | Draft of Chapter 1 of the Heber Valley Airport Master Plan, 2020 | Draft Master Plan | Download |
Draft Chapter 2 | Draft of Chapter 2 of the Heber Valley Airport Master Plan, 2020 | Draft Master Plan | Download |
Draft Chapter 3 | Draft of Chapter 3 of the Heber Valley Airport Master Plan, 2020 | Draft Master Plan | Download |
Draft Chapter 4 | Draft of Chapter 4 of the Heber Valley Airport Master Plan, 2021 | Draft Master Plan | Download |
Draft Chapter 5 | Draft of Chapter 5 of the Heber Valley Airport Master Plan, 2022 | Draft Master Plan | Download |
Existing Layout Alternatives Display Board | 09-22 Public Meeting | Download | |
FAA Advisory Circular 150/5070-6B: Airport Master Plans | Provides guidance for the preparation of airport master plans that range in size and function from small general aviation to large commercial service facilities. | Supporting Documents | Download |
FAA Advisory Circular 150/5300-13A: Airport Design | Contains the Federal Aviation Administration’s (FAA) standards and recommendations for the geometric layout and engineering design of runways, taxiways, aprons, and other facilities at civil airports. | Supporting Documents | Download |
FAA Email Response, October 2021 | Supporting Documents | Download | |
FAA Forecast Acceptance Letter | Supporting Documents | Download | |
Facility Requirements Display Board | 09-22 Public Meeting | Download | |
Flightpath Project Timeline | Flightpath Project Timeline as of December 1, 2022 | Supporting Documents | Download |
Funding Display Board | Informational graphic about the project funding | Public Meeting 1 | Download |
Methodology Display Board | Informational graphic describing the project methodology | Public Meeting 1 | Download |
Mission, Values and Goals | HCR Official Mission Values and Goals 2022 | Airport Documents | Download |
Operational Standards Display Board | Informational graphic describing the operational standards | Public Meeting 1 | Download |
Preliminary Alternatives Display Board | 09-22 Public Meeting | Download | |
Public Meeting 1 Presentations | Public Meeting 1 | Download | |
Public Comments | as of October 2022 | Public Comments | Download |
Public Presentation | September 22, 2022 | 09-22 Public Meeting | Download |
Runway Shift Alternative Display Board | 09-22 Public Meeting | Download | |
UDOT HCR Economic Impact Study, 2021 | The most recent results of Utah Department of Transportation’s economic impact study, released November 2021 | Supporting Documents | Download |
Draft Airport Layout Plan presentation | Draft Airport Layout Plan presentation for Heber Valley Airport | Supporting Documents | Download |
Terminal Area - Existing/Future | Sheet 7A | Supporting Documents | Download |
2016 Exhibit A | Airport Documents | Download | |
2003 Master Plan Final Report | Airport Documents | Download | |
2005 ALP Drawings | Airport Documents | Download | |
2013 Revised ALP | Airport Documents | Download | |
1979 Airport Layout | Airport Documents | Download | |
1984 Master Plan | Airport Documents | Download | |
Draft Airport Layout Plan | Airport Layout Plan submitted to the FAA, 2023 | Draft Master Plan | Download |
Draft 2023 Airport Master Plan with ALP | The complete draft 2023 Airport Master Plan as of May 2023 | Draft Master Plan | Download |
June 2023 Heber City Council presentation | June 20, 2023 presentation to Heber City Council | 06-23 meeting | Download |