Documents
Our goal is to be a transparent partner in this process. This website will host all available data, documents, details and timelines.
| Title | Description | Category | Download |
|---|---|---|---|
| Critical Design Aircraft Display Board | 09-22 Public Meeting | Download | |
| Draft Chapter 1 | Draft of Chapter 1 of the Heber Valley Airport Master Plan, 2020 | Draft Master Plan | Download |
| Draft Chapter 2 | Draft of Chapter 2 of the Heber Valley Airport Master Plan, 2020 | Draft Master Plan | Download |
| Draft Chapter 3 | Draft of Chapter 3 of the Heber Valley Airport Master Plan, 2020 | Draft Master Plan | Download |
| Draft Chapter 4 | Draft of Chapter 4 of the Heber Valley Airport Master Plan, 2021 | Draft Master Plan | Download |
| Draft Chapter 5 | Draft of Chapter 5 of the Heber Valley Airport Master Plan, 2022 | Draft Master Plan | Download |
| Existing Layout Alternatives Display Board | 09-22 Public Meeting | Download | |
| FAA Advisory Circular 150/5070-6B: Airport Master Plans | Provides guidance for the preparation of airport master plans that range in size and function from small general aviation to large commercial service facilities. | Supporting Documents | Download |
| FAA Advisory Circular 150/5300-13A: Airport Design | Contains the Federal Aviation Administration’s (FAA) standards and recommendations for the geometric layout and engineering design of runways, taxiways, aprons, and other facilities at civil airports. | Supporting Documents | Download |
| FAA Email Response, October 2021 | Supporting Documents | Download | |
| FAA Forecast Acceptance Letter | Supporting Documents | Download | |
| Facility Requirements Display Board | 09-22 Public Meeting | Download | |
| Flightpath Project Timeline | Flightpath Project Timeline as of December 1, 2022 | Supporting Documents | Download |
| Funding Display Board | Informational graphic about the project funding | Public Meeting 1 | Download |
| Methodology Display Board | Informational graphic describing the project methodology | Public Meeting 1 | Download |
| Mission, Values and Goals | HCR Official Mission Values and Goals 2022 | Airport Documents | Download |
| Operational Standards Display Board | Informational graphic describing the operational standards | Public Meeting 1 | Download |
| Preliminary Alternatives Display Board | 09-22 Public Meeting | Download | |
| Public Meeting 1 Presentations | Public Meeting 1 | Download | |
| Public Comments | as of October 2022 | Public Comments | Download |
| Public Presentation | September 22, 2022 | 09-22 Public Meeting | Download |
| Runway Shift Alternative Display Board | 09-22 Public Meeting | Download | |
| UDOT HCR Economic Impact Study, 2021 | The most recent results of Utah Department of Transportation’s economic impact study, released November 2021 | Supporting Documents | Download |
| Draft Airport Layout Plan presentation | Draft Airport Layout Plan presentation for Heber Valley Airport | Supporting Documents | Download |
| Terminal Area - Existing/Future | Sheet 7A | Supporting Documents | Download |
| 2016 Exhibit A | Airport Documents | Download | |
| 2003 Master Plan Final Report | Airport Documents | Download | |
| 2005 ALP Drawings | Airport Documents | Download | |
| 2013 Revised ALP | Airport Documents | Download | |
| 1979 Airport Layout | Airport Documents | Download | |
| 1984 Master Plan | Airport Documents | Download | |
| Draft Airport Layout Plan | Airport Layout Plan submitted to the FAA, 2023 | Draft Master Plan | Download |
| Draft 2023 Airport Master Plan with ALP | The complete draft 2023 Airport Master Plan as of May 2023 | Draft Master Plan | Download |
| June 2023 Heber City Council presentation | June 20, 2023 presentation to Heber City Council | 06-23 meeting | Download |